Subpart 9.4 - Debarment, Suspension, and Ineligibility
9.400 Scope of subpart.
(a) This subpart-
(1) Prescribes policies and procedures governing the debarment and suspension of contractors by agencies for the causes given in 9.406-2 and 9.407-2;
(2) Provides for the listing of contractors debarred, suspended, proposed for debarment, and declared ineligible (see the definition of "ineligible" in 2.101); and
(3) Sets forth the consequences of this listing.
(b) Although this subpart does cover the listing of ineligible contractors ( 9.404) and the effect of this listing ( 9.405), it does not prescribe policies and procedures governing declarations of ineligibility except for contractors that have been declared ineligible pursuant to 10 U.S.C. 983 (see 9.110, and 9.405-1(b)).
(c) For Federal Acquisition Supply Chain Security Act (FASCSA) orders, see subpart 4.23.
9.401 Applicability.
In accordance with Public Law 103-355, Section 2455 ( 31 U.S.C.6101, note), and Executive Order 12689, any debarment, suspension or other Governmentwide exclusion initiated under the Nonprocurement Common Rule implementing Executive Order 12549 on or after August 25, 1995, shall be recognized by and effective for Executive Branch agencies as a debarment or suspension under this subpart. Similarly, any debarment, suspension, proposed debarment or other Governmentwide exclusion initiated on or after August 25, 1995, under this subpart shall also be recognized by and effective for those agencies and participants as an exclusion under the Nonprocurement Common Rule.
9.402 Policy.
(a) Agencies shall solicit offers from, award contracts to, and consent to subcontracts with responsible contractors only. Debarment and suspension are discretionary actions that, taken in accordance with this subpart, are appropriate means to effectuate this policy.
(b) The serious nature of debarment and suspension requires that these remedies be imposed only in the public interest for the Government’s protection and not for purposes of punishment. Agencies shall impose debarment or suspension to protect the Government’s interest and only for the causes and in accordance with the procedures in this subpart.
(c) Agencies are encouraged to establish methods and procedures for coordinating their debarment or suspension actions.
(d) When more than one agency has an interest in the debarment or suspension of a contractor, the Interagency Suspension and Debarment Committee, established under Executive Order 12549, and authorized by section 873 of the National Defense Authorization Act for Fiscal Year 2009 (Pub. L. 110-417) ( 31 U.S.C.6101, note), shall resolve the lead agency issue and coordinate such resolution among all interested agencies prior to the initiation of any suspension, debarment, or related administrative action by any agency.
(e) Agencies shall establish appropriate procedures to implement the policies and procedures of this subpart.
9.403 Definitions.
As used in this subpart—
Administrative agreement means an agreement between an agency suspending and debarring official and the contractor used to resolve a suspension or debarment proceeding, or a potential suspension or debarment proceeding.
Affiliates.–
(1) Business concerns, organizations, or individuals are affiliates of each other if, directly or indirectly–
(i) Either one controls or has the power to control the other; or
(ii) A third party controls or has the power to control both.
(2) Indicia of control include, but are not limited to, interlocking management or ownership, identity of interests among family members, shared facilities and equipment, common use of employees, or a business entity organized following the debarment, suspension, or proposed debarment of a contractor which has the same or similar management, ownership, or principal employees as the contractor that was debarred, suspended, or proposed for debarment.
Agency means any executive department, military department or defense agency, or other agency or independent establishment of the executive branch.
Civil judgment means the disposition of a civil action by any court of competent jurisdiction, whether by verdict, decision, settlement, stipulation, other disposition that creates a civil liability for the complained of wrongful acts, or a final determination of liability under the Program Fraud Civil Remedies Act of 1986 ( 31 U.S.C. 3801-3812).
Conviction means—
(1) A judgment or any other determination of guilt of a criminal offense by any court of competent jurisdiction, whether entered upon a verdict or plea, including a plea of nolo contendere; or
(2) Any other resolution that is the functional equivalent of a judgment establishing a criminal offense by a court of competent jurisdiction, including probation before judgment and deferred prosecution. A disposition without the participation of the court is the functional equivalent of a judgment only if it includes an admission of guilt.
Contractor means any individual or other legal entity that–
(1) Directly or indirectly (e.g., through an affiliate), submits offers for or is awarded, or reasonably may be expected to submit offers for or be awarded, a Government contract, including a contract for carriage under Government or commercial bills of lading, or a subcontract under a Government contract; or
(2) Conducts business, or reasonably may be expected to conduct business, with the Government as an agent or representative of another contractor.
Debarring official means–
(1) An agency head; or
(2) A designee authorized by the agency head to impose debarment.
Indictment means indictment for a criminal offense. An information or other filing by competent authority charging a criminal offense is given the same effect as an indictment.
Legal proceedings means any civil judicial proceeding to which the Government is a party or any criminal proceeding. The term includes appeals from such proceedings.
Nonprocurement Common Rule means the procedures used by Federal Executive Agencies to suspend, debar, or exclude individuals or entities from participation in nonprocurement transactions under Executive Order 12549. Examples of nonprocurement transactions are grants, cooperative agreements, scholarships, fellowships, contracts of assistance, loans, loan guarantees, subsidies, insurance, payments for specified use, and donation agreements. See 2 CFR part 180 and agency enacting regulations in 2 CFR subtitle B.
Pre-notice letter means a written correspondence issued to a contractor in a suspension or debarment matter, which does not immediately result in an exclusion or ineligibility. The letter is issued at the discretion of the suspending and debarring official. The letter is not a mandatory step in the suspension or debarment process.
Unfair trade practices means the commission of any or the following acts by a contractor–
(1) A violation of section 337 of the Tariff Act of 1930 ( 19 U.S.C. 1337) as determined by the International Trade Commission.
(2) A violation, as determined by the Secretary of Commerce, of any agreement of the group known as the "Coordination Committee" for purposes of the Export Administration Act of 1979 (50 U.S.C. App. 2401, et seq.) or any similar bilateral or multilateral export control agreement.
(3) A knowingly false statement regarding a material element of a certification concerning the foreign content of an item of supply, as determined by the Secretary of the Department or the head of the agency to which such certificate was furnished.
Voluntary exclusion means a contractor's written agreement to be excluded for a period under the terms of a settlement between the contractor and the suspending and debarring official of one or more agencies. A voluntary exclusion must have Governmentwide effect.
9.404 Exclusions in the System for Award Management.
(a) The General Services Administration (GSA)—
(1) Operates the web-based System for Award Management (SAM), which contains exclusion records; and
(2) Provides technical assistance to Federal agencies in the use of SAM.
(b) An exclusion record in SAM contains the—
(1) Names and addresses of the entities debarred, suspended, proposed for debarment, voluntarily excluded, declared ineligible, or excluded or disqualified under the nonprocurement common rule, with cross-references when more than one name is involved in a single action;
(2) Name of the agency or other authority taking the action;
(3) Cause for the action (see 9.406-2 and 9.407-2 for causes authorized under this subpart) or other statutory or regulatory authority;
(4) Effect of the action;
(5) Termination date for each listing;
(6) Unique Entity Identifier;
(7) Social Security Number (SSN), Employer Identification Number (EIN), or other Taxpayer Identification Number (TIN), if available; and
(8) Name and telephone number of the agency point of contact for the action.
(c) Each agency must—
(1) Identify the individual(s) responsible for entering and updating exclusions data in SAM and assign the appropriate roles;
(2) Remove the exclusion roles in SAM when the individual leaves the organization or changes functions;
(3) For each exclusion, including each voluntary exclusion, accomplished by the agency–
(i) Enter the information required by paragraph (b) of this section within 3 working days after the action becomes effective;
(ii) Determine whether it is legally permitted to enter the SSN, EIN, or other TIN, under agency authority to suspend or debar; and
(iii) Update the exclusion record in SAM, generally within 5 working days after modifying or rescinding an action;
(4) In accordance with internal retention procedures, maintain records relating to each debarment, suspension, proposed debarment, or voluntary exclusion taken or entered into by the agency;
(5) Establish procedures to ensure that the agency does not solicit offers from, award contracts to, or consent to subcontracts with contractors who have an active exclusion record in SAM, except as otherwise provided in this subpart;
(6) Direct inquiries concerning listed contractors and other entities to the agency or other authority that took the action; and
(7) Contact GSA for technical assistance with SAM, via the support e-mail address or on the technical support phone line.
(d) SAM is available via https://www.sam.gov.
9.405 Effect of listing.
(a) Contractors debarred, suspended, proposed for debarment, or voluntarily excluded, are excluded from receiving contracts, and agencies shall not solicit offers from, award contracts to, or consent to subcontracts with these contractors, unless the agency head determines that there is a compelling reason for such action (see 9.405-1(a)(2), 9.405-2, 9.406-1(d), 9.407-1(d), and 26.505(e)). Contractors debarred, suspended, proposed for debarment, or voluntarily excluded, are also excluded from conducting business with the Government as agents or representatives of other contractors.
(b) Contractors and other entities that have an active exclusion record in SAM because they have been declared ineligible on the basis of statutory or other regulatory procedures are excluded from receiving contracts, and if applicable, subcontracts, under the conditions and for the period set forth in the statute or regulation. Agencies shall not solicit offers from, award contracts to, or consent to subcontracts with these contractors under those conditions and for that period.
(c) Agencies shall not enter into, renew, or extend contracts with contractors that have been declared ineligible pursuant to 22 U.S.C. 2593e.
(d) Contractors debarred, suspended, proposed for debarment, or voluntarily excluded, are excluded from acting as individual sureties (see part 28).
(e)
(1) After the opening of bids or receipt of proposals or quotes, the contracting officer shall review the exclusion records in SAM.
(2) Bids received from any listed contractor in response to an invitation for bids shall be entered on the abstract of bids, and rejected unless the agency head determines in writing that there is a compelling reason to consider the bid.
(3) Proposals, quotations, or offers received from any listed contractor shall not be evaluated for award or included in the competitive range, nor shall discussions be conducted with a listed offeror during a period of ineligibility, unless the agency head determines, in writing, that there is a compelling reason to do so. If the period of ineligibility expires or is terminated prior to award, the contracting officer may, but is not required to, consider such proposals, quotations, or offers.
(4) Immediately prior to award, the contracting officer shall again review the exclusion records in SAM to ensure that no award is made to a listed contractor.
9.405-1 Continuation of current contracts.
(a) Contractors debarred, suspended, proposed for debarment, or voluntarily excluded .
(1) Notwithstanding the debarment, suspension, proposed debarment, or voluntary exclusion, of a contractor, agencies may continue contracts or subcontracts in existence at the time the contractor was debarred, suspended, proposed for debarment, or voluntarily excluded, unless the agency head directs otherwise. A decision as to the type of termination action, if any, to be taken should be made only after review by agency contracting and technical personnel and by counsel to ensure the propriety of the proposed action.
(2) For contractors debarred, suspended, proposed for debarment, or voluntarily excluded, unless the agency head makes a written determination of the compelling reasons for doing so, ordering activities shall not—
(i) Place orders exceeding the guaranteed minimum under indefinite quantity contracts;
(ii) Place orders under Federal Supply Schedule contracts, blanket purchase agreements, or basic ordering agreements; or
(iii) Add new work, exercise options, or otherwise extend the duration of current contracts or orders.
(b) Ineligible contractors. A covered agency, as defined in 9.110-1, shall terminate existing contracts and shall not place new orders or award new contracts with contractors that have been declared ineligible pursuant to 10 U.S.C. 983 (see 9.110), except for contracts at or below the simplified acquisition threshold or contracts for the acquisition of commercial products and commercial services.
9.405-2 Restrictions on subcontracting.
(a) When a contractor debarred, suspended, proposed for debarment, or voluntarily excluded, is proposed as a subcontractor for any subcontract subject to Government consent (see subpart 44.2), contracting officers shall not consent to subcontracts with such contractors unless the agency head states in writing the compelling reasons for this approval action. (See 9.405 concerning declarations of ineligibility affecting sub-contracting.)
(b) The Government suspends or debars contractors to protect the Government’s interests. Contractors are prohibited from entering into any subcontract in excess of $35,000, other than a subcontract for a commercially available off-the-shelf item, with a contractor that has been debarred, suspended, proposed for debarment, or voluntarily excluded, unless there is a compelling reason to do so. If a contractor intends to enter into a subcontract in excess of $35,000, other than a subcontract for a commercially available off-the-shelf item, with a party that is debarred, suspended, proposed for debarment, or voluntarily excluded, as evidenced by the party's having an active exclusion record in SAM (see 9.404), a corporate officer or designee of the contractor is required by operation of the clause at 52.209-6, Protecting the Government’s Interest when Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded, to notify the contracting officer, in writing, before entering into such subcontract. For contracts for the acquisition of commercial products, the notification requirement applies only for first-tier subcontracts. For all other contracts, the notification requirement applies to subcontracts at any tier. The notice must provide the following:
(1) The name of the subcontractor;
(2) The contractor’s knowledge of the reasons for the subcontractor having an active exclusion record in SAM;
(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its having an active exclusion record in SAM; and
(4) The systems and procedures the contractor has established to ensure that it is fully protecting the Government’s interests when dealing with such subcontractor in view of the specific basis for the party’s debarment, suspension, proposed debarment, or voluntary exclusion.
(c) The contractor’s compliance with the requirements of 52.209-6 will be reviewed during Contractor Purchasing System Reviews (see subpart 44.3).
9.406 Debarment.
9.406-1 General.
(a) It is the suspending and debarring official's responsibility to determine whether debarment is in the Government's interest. The suspending and debarring official may, in the public interest, debar a contractor for any of the causes in 9.406-3. The existence of a cause for debarment, however, does not necessarily require that the contractor be debarred; the seriousness of the contractor's acts or omissions and any remedial measures, mitigating factors, or aggravating factors should be considered in making any debarment decision. Before arriving at any debarment decision, the suspending and debarring official should consider factors such as the following (some of the factors below could apply to individuals such as contractors that are individuals, and are so marked):
(1) Whether the contractor had effective standards of conduct and internal control systems in place at the time of the activity which constitutes cause for debarment or had adopted such procedures prior to any Government investigation of the activity cited as a cause for debarment.
(2) Whether the contractor (including an individual) brought the activity cited as a cause for debarment to the attention of the appropriate Government agency in a timely manner.
(3) Whether the contractor has fully investigated the circumstances surrounding the cause for debarment (or the individual cooperated with the investigation) and, if so, made the result of the investigation available to the suspending and debarring official.
(4) Whether the contractor (including an individual) cooperated fully with Government agencies during the investigation and any court or administrative action.
(5) Whether the contractor (including an individual) has paid or has agreed to pay all criminal, civil, and administrative liability for the improper activity, including any investigative or administrative costs incurred by the Government, and has made or agreed to make full restitution.
(6) Whether the contractor has taken appropriate disciplinary action against the individuals responsible for the activity which constitutes cause for debarment.
(7) Whether the contractor (including an individual) has implemented or agreed to implement remedial measures, including any identified by the Government.
(8)
(i) Whether the contractor has instituted or agreed to institute new or revised review and control procedures, ethics training, or other relevant training programs.
(ii) For an individual, whether the individual has attended relevant remediation training.
(9) Whether the contractor (including an individual) has had adequate time to eliminate the circumstances that led to the cause for debarment.
(10)
(i) Whether the contractor's management recognizes, accepts, and understands the seriousness of the misconduct giving rise to the cause for debarment and has implemented programs to prevent recurrence.
(ii) For an individual, whether the individual recognizes, accepts, and understands the seriousness of the misconduct giving rise to the cause for debarment and has adopted practices to prevent recurrence.
(11) Whether the contractor (including an individual) has a pattern or prior history of wrongdoing, the frequency of incidents and/or duration of the wrongdoing, and the actual or potential harm or impact that results, or may result, from the wrongdoing.
(12) Whether and to what extent the contractor (including an individual) planned, initiated, or carried out the wrongdoing, and the kind of positions within the contractor's organization held by the individual involved in the wrongdoing.
(13) Whether the wrongdoing was pervasive within the contractor's organization.
(14) Whether the individual or the contractor's principals tolerated the offense.
(15) Whether the contractor (including an individual) is or has been excluded or disqualified by an agency of the Federal Government or has not been allowed to participate in State or local contracts or assistance agreements on a basis of conduct similar to one or more of the causes for debarment specified in this subpart.
(16) Whether the contractor (including an individual) has entered into an administrative agreement with a Federal agency or a similar agreement with a State or local government that is not Governmentwide but is based on conduct similar to one or more of the causes for debarment specified in this subpart.
(17) Whether there are any other factors to consider for the contractor (including an individual) appropriate to the circumstances of a particular case.
(b) The existence or nonexistence of any aggravating or mitigating factors or remedial measures such as set forth in paragraph (a) of this section is not necessarily determinative of a contractor's present responsibility. Accordingly, if a cause for debarment exists, the contractor has the burden of demonstrating, to the satisfaction of the suspending and debarring official, its present responsibility and that debarment is not necessary.
(c) Debarment constitutes debarment of all divisions or other organizational elements of the contractor, unless the debarment decision is limited by its terms to specific divisions, organizational elements, or commodities. The suspending and debarring official may extend the debarment decision to include any affiliates of the contractor if they are—
(1) Specifically named; and
(2) Given written notice of the proposed debarment and an opportunity to respond (see 9.406-3(c)).
(d) A contractor's debarment, or proposed debarment, shall be effective throughout the executive branch of the Government, unless the agency head or a designee (except see 26.505(e)) states in writing the compelling reasons justifying continued business dealings between that agency and the contractor.
(e)
(1) When the suspending and debarring official has authority to debar contractors from both contracts pursuant to the Federal Acquisition Regulation in this chapter and contracts for the purchase of Federal personal property pursuant to the Federal Management Regulation (FMR) in 41 CFR part 102-38, that official shall consider simultaneously debarring the contractor from the award of acquisition contracts and from the purchase of Federal personal property.
(2) When debarring a contractor from the award of acquisition contracts and from the purchase of Federal personal property, the debarment notice shall so indicate and the appropriate FAR and FMR citations shall be included.
9.406-2 Causes for debarment.
The suspending and debarring official may debar-
(a) A contractor for a conviction of or civil judgment for-
(1) Commission of fraud or a criminal offense in connection with-
(i) Obtaining;
(ii) Attempting to obtain; or
(iii) Performing a public contract or subcontract.
(2) Violation of Federal or State antitrust statutes relating to the submission of offers;
(3) Commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property;
(4) Intentionally affixing a label bearing a "Made in America" inscription (or any inscription having the same meaning) to a product sold in or shipped to the United States or its outlying areas, when the product was not made in the United States or its outlying areas (see Section 202 of the Defense Production Act (Public Law102-558)); or
(5) Commission of any other offense indicating a lack of business integrity or business honesty that seriously and directly affects the present responsibility of a Government contractor or subcontractor.
(b)
(1) A contractor, based upon a preponderance of the evidence, for any of the following-
(i) Violation of the terms of a Government contract or subcontract so serious as to justify debarment, such as-
(A) Willful failure to perform in accordance with the terms of one or more contracts; or
(B) A history of failure to perform, or of unsatisfactory performance of, one or more contracts.
(ii) Violations of 41 U.S.C. chapter 81, Drug-Free Workplace, as indicated by-
(A) Failure to comply with the requirements of the clause at 52.226-7, Drug-Free Workplace; or
(B) Such a number of contractor employees convicted of violations of criminal drug statutes occurring in the workplace as to indicate that the contractor has failed to make a good faith effort to provide a drug-free workplace (see 26.504).
(iii) Intentionally affixing a label bearing a "Made in America" inscription (or any inscription having the same meaning) to a product sold in or shipped to the United States or its outlying areas, when the product was not made in the United States or its outlying areas (see Section 202 of the Defense Production Act (Public Law102-558)).
(iv) Commission of an unfair trade practice as defined in 9.403 (see Section 201 of the Defense Production Act (Pub.L.102-558)).
(v) Delinquent Federal taxes in an amount that exceeds $10;000.
(A) Federal taxes are considered delinquent for purposes of this provision if both of the following criteria apply:
(1) The tax liability is finally determined. The liability is finally determined if it has been assessed. A liability is not finally determined if there is a pending administrative or judicial challenge. In the case of a judicial challenge to the liability, the liability is not finally determined until all judicial appeal rights have been exhausted.
(2) The taxpayer is delinquent in making payment. A taxpayer is delinquent if the taxpayer has failed to pay the tax liability when full payment was due and required. A taxpayer is not delinquent in cases where enforced collection action is precluded.
(B) Examples.
(1) The taxpayer has received a statutory notice of deficiency, under I.R.C. §6212, which entitles the taxpayer to seek Tax Court review of a proposed tax deficiency. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek Tax Court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(2) The IRS has filed a notice of Federal tax lien with respect to an assessed tax liability, and the taxpayer has been issued a notice under I.R.C. §6320 entitling the taxpayer to request a hearing with the IRS Office of Appeals contesting the lien filing, and to further appeal to the Tax Court if the IRS determines to sustain the lien filing. In the course of the hearing, the taxpayer is entitled to contest the underlying tax liability because the taxpayer has had no prior opportunity to contest the liability. This is not a delinquent tax because it is not a final tax liability. Should the taxpayer seek tax court review, this will not be a final tax liability until the taxpayer has exercised all judicial appeal rights.
(3) The taxpayer has entered into an installment agreement pursuant to I.R.C. §6159. The taxpayer is making timely payments and is in full compliance with the agreement terms. The taxpayer is not delinquent because the taxpayer is not currently required to make full payment.
(4) The taxpayer has filed for bankruptcy protection. The taxpayer is not delinquent because enforced collection action is stayed under 11 U.S.C. 362 (the Bankruptcy Code).
(vi) Knowing failure by a principal, until 3 years after final payment on any Government contract awarded to the contractor, to timely disclose to the Government, in connection with the award, performance, or closeout of the contract or a subcontract thereunder, credible evidence of-
(A) Violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the United States Code;
(B) Violation of the civil False Claims Act ( 31 U.S.C. 3729- 3733); or
(C) Significant overpayment(s) on the contract, other than overpayments resulting from contract financing payments as defined in 32.001.
(vii) Determination of a false certification under 52.209-13, Violation of Arms Control Treaties or Agreements-Certification.
(2) A contractor, based on a determination by the Secretary of Homeland Security or the Attorney General of the United States, that the contractor is not in compliance with Immigration and Nationality Act employment provisions (see Executive Order12989, as amended by Executive Order13286). Such determination is not reviewable in the debarment proceedings.
(c) A contractor or subcontractor based on any other cause of so serious or compelling a nature that it affects the present responsibility of the contractor or subcontractor.
9.406-3 Procedures.
(a) Investigation and referral. Agencies shall establish procedures for the prompt reporting, investigation, and referral to the suspending and debarring official of matters appropriate for that official’s consideration.
(b) Decision-making process.
(1) Agencies shall establish procedures governing the debarment decision-making process that are as informal as is practicable, consistent with principles of fundamental fairness. These procedures shall afford the contractor (and any specifically named affiliates) an opportunity to submit, in person, in writing, or through a representative, information and argument in opposition to the proposed debarment. If the suspending and debarring official extends the opportunity for the contractor to submit material in opposition, then the official should also give a deadline for submission of materials. The suspending and debarring official may use flexible procedures to allow a contractor to present matters in opposition in person or remotely through appropriate technology; if so, the suspending and debarring official should change the notice in paragraph (c)(3)(iv) of this section to include those flexible procedures.
(2) In actions not based upon a conviction or civil judgment, if it is found that the contractor’s submission in opposition raises a genuine dispute over facts material to the proposed debarment, agencies shall also-
(i) Afford the contractor an opportunity to appear with counsel, submit documentary evidence, present witnesses, and confront any person the agency presents; and
(ii) Make a transcribed record of the proceedings and make it available at cost to the contractor upon request, unless the contractor and the agency, by mutual agreement, waive the requirement for a transcript.
(c) Notice of proposal to debar. A notice of proposed debarment shall be issued by the suspending and debarring official to the contractor and any specifically named affiliates.
(1) The written notice shall be sent—
(i) By U.S. mail or private delivery service to the last known street address, with delivery notification service;
(ii) By email to the point of contact email address in the contractor's SAM registration, if any, or to the last known email address as confirmed by the agency; or
(iii) By certified mail to the last known street address with return receipt requested.
(2) The notice shall be sent—
(i) To the contractor, the contractor's identified counsel for purposes of the administrative proceedings, or the contractor's agent for service of process; and
(ii) For each specifically named affiliate, to the affiliate itself, the affiliate's identified counsel for purposes of the administrative proceedings, or the affiliate's agent for service of process.
(3) The notice shall state—
(i) That debarment is being considered;
(ii) The reasons for the proposed debarment in terms sufficient to put the contractor on notice of the conduct or transaction(s) upon which it is based;
(iii) The cause(s) relied upon under 9.406-2 for proposing debarment;
(iv) That, within 30 days after receipt of the notice, the contractor may submit, in person, in writing, or through a representative, information and argument in opposition to the proposed debarment, including any additional specific information that raises a genuine dispute over the material facts;
(v) The agency's procedures governing debarment decision making;
(vi) The effect of the issuance of the notice of proposed debarment;
(vii) The potential effect of an actual debarment;
(viii) That in addition to any information and argument in opposition to a proposed debarment, the contractor must identify—
(A) Specific facts that contradict the statements contained in the notice of proposed debarment. Include any information about any of the factors listed in 9.406-1(a). A general denial is insufficient to raise a genuine dispute over facts material to the proposed debarment;
(B) All existing, proposed, or prior exclusions and all similar actions taken by Federal, State, or local agencies, including administrative agreements that affect only those agencies;
(C) All criminal and civil proceedings not included in the notice of proposed debarment that grew out of facts relevant to the cause(s) stated in the notice; and
(D) All of the contractor's affiliates; and
(ix) That if the contractor fails to disclose the information in paragraph (c)(3)(viii) of this section, or provides false information, the agency taking the action may seek further criminal, civil, or administrative action against the contractor, as appropriate.
(d) Suspending and debarring official’s decision.
(1) In actions based upon a conviction or civil judgment, or in which there is no genuine dispute over material facts, the suspending and debarring official shall make a decision on the basis of all the information in the administrative record, including any submission made by the contractor. If no suspension is in effect, the decision shall be made within 45 days from the date that the official administrative record is closed, unless the suspending and debarring official extends this period for good cause. The official record closes upon the expiration of the contractor's time to submit information and argument in opposition, including any extensions (see paragraph (b)(1) of this section).
(2)
(i) In actions in which additional proceedings are necessary as to disputed material facts, written findings of fact shall be prepared. The suspending and debarring official shall base the decision on the facts as found, together with any information and argument submitted by the contractor and any other information in the administrative record.
(ii) The suspending and debarring official may refer matters involving disputed material facts to another official for findings of fact. The suspending and debarring official may reject any such findings, in whole or in part, only after specifically determining them to be arbitrary and capricious or clearly erroneous.
(iii) The suspending and debarring official's decision shall be made after the conclusion of the proceedings with respect to disputed facts.
(3) In any action in which the proposed debarment is not based upon a conviction or civil judgment, the cause for debarment must be established by a preponderance of the evidence.
(e) Notice of suspending and debarring official's decision.
(1) If the suspending and debarring official decides to impose debarment, the contractor and any affiliates involved shall be given prompt notice using the procedures in paragraphs (c)(1) and (2) of this section—
(i) Referring to the notice of proposed debarment;
(ii) Specifying the reasons for debarment;
(iii) Stating the period of debarment, including effective dates; and
(iv) Advising that the debarment is effective throughout the executive branch of the Government unless the head of an agency or a designee makes the statement called for by 9.406-1(d).
(2) If debarment is not imposed, the suspending and debarring official shall promptly notify the contractor and any affiliates involved, using the procedures in paragraphs (c)(1) and (2) of this section.
(f) Administrative agreements.
(1) If the contractor enters into an administrative agreement with the Government in order to resolve a debarment or potential debarment proceeding, the suspending and debarring official shall access the website (available at https://www.cpars.gov, then select FAPIIS), enter the requested information, and upload documentation reflecting the administrative agreement.
(2) The suspending and debarring official is responsible for the timely and accurate submission of documentation reflecting the administrative agreement. The submission should be made within 3 working days.
(3) With regard to information that may be covered by a disclosure exemption under the Freedom of Information Act, the suspending and debarring official shall follow the procedures at 9.105-2(b)(2)(iv).
(g) Voluntary exclusions.
(1) If the contractor enters into a voluntary exclusion with the Government in order to resolve a debarment or potential debarment matter, the suspending and debarring official shall access the website (available at https://www.sam.gov) and enter the requested information into the exclusions section of SAM (see 9.404(c)(3)).
(2) The suspending and debarring official is responsible for the timely and accurate submission of documentation reflecting the voluntary exclusion. The submission should be made within 3 working days.
(3) Regarding information that may be covered by a disclosure exemption under the Freedom of Information Act, the suspending and debarring official shall follow the procedures at 9.105-2(b)(2)(iv).
(h) Pre-notice letters. Prior to initiating a proposed debarment, a pre-notice letter may be issued at the discretion of the agency suspending and debarring official. A pre-notice letter is not required to initiate debarment under this subpart. (See 9.403.)
9.406-4 Period of debarment.
(a)
(1) Debarment shall be for a period commensurate with the seriousness of the cause(s). Generally, debarment should not exceed 3 years, except that-
(i) Debarment for violation of the provisions of 41 U.S.C. chapter 81, Drug-Free Workplace (see 26.505) may be for a period not to exceed 5 years;
(ii) Debarments under 9.406-2(b)(2) shall be for 1 year unless extended pursuant to paragraph (b) of this section; and
(iii) Debarments under 9.406-2(b)(1)(vii) shall be for a period of not less than 2 years, inclusive of any suspension period, if suspension precedes a debarment (see paragraph (a)(2) of this section).
(2) If suspension precedes a debarment, the suspension period shall be considered in determining the debarment period.
(b) The suspending and debarring official may extend the debarment for an additional period, if that official determines that an extension is necessary to protect the Government’s interest. However, a debarment may not be extended solely on the basis of the facts and circumstances upon which the initial debarment action was based. Debarments under 9.406-2(b)(2) may be extended for additional periods of one year if the Secretary of Homeland Security or the Attorney General determines that the contractor continues to be in violation of the employment provisions of the Immigration and Nationality Act. If debarment for an additional period is determined to be necessary, the procedures of 9.406-3 shall be followed to extend the debarment.
(c) The suspending and debarring official may reduce the period or extent of debarment, upon the contractor’s request, supported by documentation, for reasons such as-
(1) Newly discovered material evidence;
(2) Reversal of the conviction or civil judgment upon which the debarment was based;
(3) Bona fide change in ownership or management;
(4) Elimination of other causes for which the debarment was imposed; or
(5) Other reasons the the suspending and debarring official deems appropriate.
9.406-5 Scope of debarment.
(a) The fraudulent, criminal, or other seriously improper conduct of any officer, director, shareholder, partner, employee, or other individual associated with a contractor may be imputed to the contractor when the conduct occurred in connection with the individual’s performance of duties for or on behalf of the contractor, or with the contractor’s knowledge, approval, or acquiescence. The contractor’s acceptance of the benefits derived from the conduct shall be evidence of such knowledge, approval, or acquiescence.
(b) The fraudulent, criminal, or other seriously improper conduct of a contractor may be imputed to any officer, director, shareholder, partner, employee, or other individual associated with the contractor who participated in, knew of, or had reason to know of the contractor’s conduct.
(c) The fraudulent, criminal, or other seriously improper conduct of one contractor participating in a joint venture or similar arrangement may be imputed to other participating contractors if the conduct occurred for or on behalf of the joint venture or similar arrangement, or with the knowledge, approval, or acquiescence of these contractors. Acceptance of the benefits derived from the conduct shall be evidence of such knowledge, approval, or acquiescence.
9.407 Suspension.
9.407-1 General.
(a) The suspending and debarring official may, in the public interest, suspend a contractor for any of the causes in 9.407-2, using the procedures in 9.407-3.
(b)
(1) Suspension is a serious action to be imposed on the basis of adequate evidence, pending the completion of an investigation or legal proceedings, when it has been determined that immediate action is necessary to protect the Government's interest. In deciding whether immediate action is necessary to protect the Government's interest, the suspending and debarring official has wide discretion. The suspending and debarring official may infer the necessity for immediate action to protect the Government's interest either from the nature of the circumstances giving rise to a cause for suspension or from potential business relationships or involvement with a program of the Federal Government. In assessing the adequacy of the evidence, agencies should consider how much information is available, how credible it is given the circumstances, whether or not important allegations are corroborated, and what inferences can reasonably be drawn as a result. This assessment should include an examination of basic documents such as contracts, inspection reports, and correspondence. An indictment or other official findings by Federal, State, or local bodies that determine factual and/or legal matters, constitutes adequate evidence for purposes of suspension actions.
(2) The existence of a cause for suspension does not necessarily require that the contractor be suspended. The suspending and debarring official should consider the seriousness of the contractor's acts or omissions and may, but is not required to, consider remedial measures, mitigating factors, or aggravating factors, such as those in 9.406-1(a). A contractor has the burden of promptly presenting to the suspending and debarring official evidence of remedial measures or mitigating factors when it has reason to know that a cause for suspension exists. The existence or nonexistence of any remedial measures or aggravating or mitigating factors is not necessarily determinative of a contractor's present responsibility.
(c) Suspension constitutes suspension of all divisions or other organizational elements of the contractor, unless the suspension decision is limited by its terms to specific divisions, organizational elements, or commodities. The suspending and debarring official may extend the suspension decision to include any affiliates of the contractor if they are-
(1) Specifically named; and
(2) Given written notice of the suspension and an opportunity to respond (see 9.407-3(c)).
(d) A contractor’s suspension shall be effective throughout the executive branch of the Government, unless the agency head or a designee (except see 26.505(e)) states in writing the compelling reasons justifying continued business dealings between that agency and the contractor.
(e)
(1) When the suspending and debarring official has authority to suspend contractors from both contracts pursuant to the Federal Acquisition Regulation in this chapter and contracts for the purchase of Federal personal property pursuant to Federal Management Regulation (FMR) in 41 CFR part 102-38, that official shall consider simultaneously suspending the contractor from the award of acquisition contracts and from the purchase of Federal personal property.
(2) When suspending a contractor from the award of acquisition contracts and from the purchase of Federal personal property, the suspension notice shall so indicate and the appropriate FAR and FMR citations shall be included.
9.407-2 Causes for suspension.
(a) The suspending and debarring official may suspend a contractor suspected, upon adequate evidence, of-
(1) Commission of fraud or a criminal offense in connection with-
(i) Obtaining;
(ii) Attempting to obtain; or
(iii) Performing a public contract or subcontract.
(2) Violation of Federal or State antitrust statutes relating to the submission of offers;
(3) Commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, tax evasion, violating Federal criminal tax laws, or receiving stolen property;
(4) Violations of 41 U.S.C. chapter 81, Drug-Free Workplace, as indicated by-
(i) Failure to comply with the requirements of the clause at 52.226-7, Drug-Free Workplace; or
(ii) Such a number of contractor employees convicted of violations of criminal drug statutes occurring in the workplace as to indicate that the contractor has failed to make a good faith effort to provide a drug-free workplace (see 26.504);
(5) Intentionally affixing a label bearing a "Made in America" inscription (or any inscription having the same meaning) to a product sold in or shipped to the United States or its outlying areas, when the product was not made in the United States or its outlying areas (see Section 202 of the Defense Production Act (Public Law102-558));
(6) Commission of an unfair trade practice as defined in 9.403 (see section 201 of the Defense Production Act (Pub.L.102-558));
(7) Delinquent Federal taxes in an amount that exceeds $10;000. See the criteria at 9.406-2(b)(1)(v) for determination of when taxes are delinquent;
(8) Knowing failure by a principal, until 3 years after final payment on any Government contract awarded to the contractor, to timely disclose to the Government, in connection with the award, performance, or closeout of the contract or a subcontract thereunder, credible evidence of-
(i) Violation of Federal criminal law involving fraud, conflict of interest, bribery, or gratuity violations found in Title 18 of the United States Code;
(ii) Violation of the civil False Claims Act ( 31 U.S.C. 3729- 3733); or
(iii) Significant overpayment(s) on the contract, other than overpayments resulting from contract financing payments as defined in 32.001; or
(9) Determination of a false certification under 52.209-13, Violation of Arms Control Treaties or Agreements-Certification.
(10) Commission of any other offense indicating a lack of business integrity or business honesty that seriously and directly affects the present responsibility of a Government contractor or subcontractor.
(b) Indictment for any of the causes in paragraph (a) of this section constitutes adequate evidence for suspension.
(c) The suspending and debarring official may upon adequate evidence also suspend a contractor for any other cause of so serious or compelling a nature that it affects the present responsibility of a Government contractor or subcontractor.
9.407-3 Procedures.
(a) Investigation and referral. Agencies shall establish procedures for the prompt reporting, investigation, and referral to the suspending and debarring official of matters appropriate for that official’s consideration.
(b) Decision-making process.
(1) Agencies shall establish procedures governing the suspension decision-making process that are as informal as is practicable, consistent with principles of fundamental fairness. These procedures shall afford the contractor (and any specifically named affiliates) an opportunity, following the imposition of suspension, to submit, in person, in writing, or through a representative, information and argument in opposition to the suspension. If the suspending and debarring official extends the opportunity for the contractor to submit material in opposition, then the official should also give a deadline for submission of materials. The suspending and debarring official may use the flexible procedures in 9.406-3(b)(1); if so, the suspending and debarring official should change the notice in paragraph (c)(5) of this section to include those flexible procedures.
(2) In actions not based on an indictment, if it is found that the contractor’s submission in opposition raises a genuine dispute over facts material to the suspension and if no determination has been made, on the basis of advice from the Department of Justice, a U.S. Attorney's office, State attorney general's office, or a State or local prosecutor's office, that substantial interests of the Government in pending or contemplated legal proceedings based on the same facts as the suspension would be prejudiced, agencies shall also-
(i) Afford the contractor an opportunity to appear with counsel, submit documentary evidence, present witnesses, and confront any person the agency presents; and
(ii) Make a transcribed record of the proceedings and make it available at cost to the contractor upon request, unless the contractor and the agency, by mutual agreement, waive the requirement for a transcript.
(c) Notice of suspension. When a contractor and any specifically named affiliates are suspended, they shall be immediately advised using the procedures in 9.406-3(c)(1) and (2)—
(1) That they have been suspended and that the suspension is based on an indictment or other adequate evidence that the contractor has committed irregularities–
(i) Of a serious nature in business dealings with the Government; or
(ii) Seriously reflecting on the propriety of further Government dealings with the contractor—any such irregularities shall be described in terms sufficient to place the contractor on notice without disclosing the Government's evidence;
(2) That the suspension is for a temporary period pending the completion of an investigation and such legal proceedings as may ensue;
(3) Of the cause(s) relied upon under 9.407-2 for imposing suspension;
(4) Of the effect of the suspension;
(5) That, within 30 days after receipt of the notice, the contractor may submit, in person, in writing, or through a representative, information and argument in opposition to the suspension, including any additional specific information that raises a genuine dispute over the material facts;
(6) That additional proceedings to determine disputed material facts will be conducted unless–
(i) The action is based on an indictment; or
(ii) A determination is made, on the basis of advice by the Department of Justice, a U.S. Attorney's office, State attorney general's office, or a State or local prosecutor's office, that the substantial interests of the Government in pending or contemplated legal proceedings based on the same facts as the suspension would be prejudiced;
(7) That, in addition to any information and argument in opposition to a suspension, the contractor must identify–
(i) Specific facts that contradict the statements contained in the notice of suspension. Include any information about any of the factors listed in 9.406-1(a). A general denial is insufficient to raise a genuine dispute over facts material to the suspension;
(ii) All existing, proposed, or prior exclusions and all similar actions taken by Federal, State, or local agencies, including administrative agreements that affect only those agencies;
(iii) All criminal and civil proceedings not included in the notice of suspension that grew out of facts relevant to the cause(s) stated in the notice; and
(iv) All of the contractor's affiliates; and
(8) That if the contractor fails to disclose the information in paragraph (c)(7) of this section or provides false information, the agency taking the action may seek further criminal, civil, or administrative action against the contractor, as appropriate.
(d) Suspending and debarring official’s decision.
(1) The suspending and debarring official's decision shall be based on all the information in the administrative record, including any submission made by the contractor, for actions—
(i) Based on an indictment;
(ii) In which the contractor's submission does not raise a genuine dispute over material facts; or
(iii) In which additional proceedings to determine disputed material facts have been denied on the basis of advice from the Department of Justice, a U.S. Attorney's office, State attorney general's office, or a State or local prosecutor's office.
(2)
(i) In actions in which additional proceedings are necessary as to disputed material facts, written findings of fact shall be prepared. The suspending and debarring official shall base the decision on the facts as found, together with any information and argument submitted by the contractor and any other information in the administrative record.
(ii) Thesuspending and debarring official may refer matters involving disputed material facts to another official for findings of fact. The suspending and debarring official may reject any such findings, in whole or in part, only after specifically determining them to be arbitrary and capricious or clearly erroneous.
(iii) The suspending and debarring official's decision shall be made after the conclusion of the proceedings with respect to disputed facts.
(3) The suspending and debarring official may modify or terminate the suspension or leave it in force (for example, see 9.406-4(c) for the reasons for reducing the period or extent of debarment). However, a decision to modify or terminate the suspension shall be without prejudice to the subsequent imposition of—
(i) Suspension by any other agency; or
(ii) Debarment by any agency.
(4) Prompt written notice of the suspending and debarring official's decision shall be sent to the contractor and any affiliates involved, using the procedures in 9.406-3(c)(1) and (2).
(e) Administrative agreement.
(1) If the contractor enters into an administrative agreement with the Government in order to resolve a suspension or potential suspension proceeding, the suspending and debarring official shall access the website (available at https://www.cpars.gov, then select FAPIIS), enter the requested information, and upload documentation reflecting the administrative agreement.
(2) The suspending and debarring official is responsible for the timely and accurate submission of documentation reflecting the administrative agreement. The submission should be made within 3 working days.
(3) With regard to information that may be covered by a disclosure exemption under the Freedom of Information Act, the suspending and debarring official shall follow the procedures at 9.105-2(b)(2)(iv).
(f) Voluntary exclusion.
(1) If the contractor enters into a voluntary exclusion with the Government in order to resolve a suspension or potential suspension proceeding, the suspending and debarring official shall access the website (available at https://www.sam.gov) and enter the requested information into the exclusions section of SAM (see 9.404(c)(3)).
(2) The suspending and debarring official is responsible for the timely and accurate submission of documentation reflecting the voluntary exclusion. The submission should be made within 3 working days.
(3) Regarding information that may be covered by a disclosure exemption under the Freedom of Information Act, the suspending and debarring official shall follow the procedures at 9.105-2(b)(2)(iv).
(g) Pre-notice letter. Prior to initiating a suspension, a pre-notice letter may be issued at the discretion of the agency suspending and debarring official. A pre-notice letter is not required to initiate suspension under this subpart. (See 9.403.)
9.407-4 Period of suspension.
(a) Suspension shall be for a temporary period pending the completion of an investigation and any ensuing legal proceedings, unless sooner terminated by the suspending and debarring official or as provided in this section.
(b) If legal proceedings are not initiated within 12 months after the date of the suspension notice, the suspension shall be terminated unless an office of a U.S. Assistant Attorney General, U.S. Attorney, or other responsible prosecuting official requests its extension, in which case it may be extended for an additional 6 months. In no event may a suspension extend beyond 18 months, unless legal proceedings have been initiated within that period.
(c) The suspending and debarring official shall notify the Department of Justice or other responsible prosecuting official of the proposed termination of the suspension, at least 30 days before the 12-month period expires, to give that official an opportunity to request an extension on the Government's behalf.
9.407-5 Scope of suspension.
9.408 [Reserved]
9.409 Contract clause.
The contracting officer shall insert the clause at 52.209-6, Protecting the Government's Interest when Subcontracting with Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded, in solicitations and contracts where the contract value exceeds $35,000.